SPECTACULAR NIGHT SEES THE PLACEMENT OF THE FIRST OVERPASS ACROSS THE MILAN-BRESCIA RAILWAY LINE
13/05/2013 On a moonlit night, the vast 76 m crane moved its 72 m arm with millimetric precision to position – as if it were moving a twig – the metal frame of the first carriageway for the Milan Outer Eastern Bypass (180 tons / 55m long) with surgical precision onto the previously constructed supporting [...]